[{"data":1,"prerenderedAt":243},["ShallowReactive",2],{"navigation_docs_fr":3,"-fr-roadmap":52,"-fr-roadmap-surround":238},[4,14,32,42],{"title":5,"path":6,"stem":7,"children":8},"L'essentiel","/fr/proposition","fr/1.proposition/1.index",[9,10],{"title":5,"path":6,"stem":7},{"title":11,"path":12,"stem":13},"Votre besoin, compris","/fr/proposition/comprehension","fr/1.proposition/2.comprehension",{"title":15,"path":16,"stem":17,"children":18},"Vue d'ensemble","/fr/architecture","fr/2.architecture/1.index",[19,20,24,28],{"title":15,"path":16,"stem":17},{"title":21,"path":22,"stem":23},"Les choix techniques","/fr/architecture/stack","fr/2.architecture/2.stack",{"title":25,"path":26,"stem":27},"Sécurité & conformité","/fr/architecture/securite","fr/2.architecture/3.securite",{"title":29,"path":30,"stem":31},"Les 19 modules","/fr/architecture/modules","fr/2.architecture/4.modules",{"title":33,"path":34,"stem":35,"children":36},"Le planning 8 mois","/fr/roadmap","fr/3.roadmap/1.index",[37,38],{"title":33,"path":34,"stem":35},{"title":39,"path":40,"stem":41},"La méthode","/fr/roadmap/methodologie","fr/3.roadmap/2.methodologie",{"title":43,"path":44,"stem":45,"children":46},"Vortex-Soft","/fr/equipe","fr/4.equipe/1.index",[47,48],{"title":43,"path":44,"stem":45},{"title":49,"path":50,"stem":51},"Références — eCampus","/fr/equipe/references","fr/4.equipe/2.references",{"id":53,"title":33,"badge":54,"body":55,"category":54,"description":231,"extension":232,"links":54,"meta":233,"navigation":235,"path":34,"seo":236,"stem":35,"tags":54,"__hash__":237},"docs_fr/fr/3.roadmap/1.index.md",null,{"type":56,"value":57,"toc":226},"minimark",[58,66,69,207,215,220,223],[59,60,61,65],"p",{},[62,63,64],"strong",{},"Mise en production à M+8."," Le design garde un sprint d'avance sur le développement ; trois pistes avancent en parallèle, une par ingénieur.",[67,68],"erk-gantt",{},[70,71,72,91],"table",{},[73,74,75],"thead",{},[76,77,78,82,85,88],"tr",{},[79,80,81],"th",{},"Phase",[79,83,84],{},"Contenu",[79,86,87],{},"Période",[79,89,90],{},"Jalon",[92,93,94,109,126,143,160,177,191],"tbody",{},[76,95,96,100,103,106],{},[97,98,99],"td",{},"0 — Cadrage",[97,101,102],{},"Ateliers, maquettes, design system, infrastructure",[97,104,105],{},"M1",[97,107,108],{},"Maquettes validées",[76,110,111,114,117,120],{},[97,112,113],{},"1 — Socle",[97,115,116],{},"Authentification 2FA, 7 rôles, projets, tableau de bord",[97,118,119],{},"M2–M3",[97,121,122,125],{},[62,123,124],{},"Démo 1"," : connexion à ERK+",[76,127,128,131,134,137],{},[97,129,130],{},"2 — Pilotage & transactions",[97,132,133],{},"Chronologie, budget, suivi financier, devis, paiement",[97,135,136],{},"M3–M4",[97,138,139,142],{},[62,140,141],{},"Démo 2"," : parcours financier de bout en bout",[76,144,145,148,151,154],{},[97,146,147],{},"3 — Chantier & médias",[97,149,150],{},"Journal de chantier, matériaux, photos, vidéos, caméra live",[97,152,153],{},"M3–M5",[97,155,156,159],{},[62,157,158],{},"Démo 3"," : chantier en direct",[76,161,162,165,168,171],{},[97,163,164],{},"4 — Documents & communication",[97,166,167],{},"Coffre-fort, e-signature, messagerie, notifications",[97,169,170],{},"M5–M6",[97,172,173,176],{},[62,174,175],{},"Démo 4"," : contrat signé dans le coffre-fort",[76,178,179,182,185,188],{},[97,180,181],{},"5 — Durcissement",[97,183,184],{},"Rapports, livraison, garantie ; tests de charge et d'intrusion",[97,186,187],{},"M6–M7",[97,189,190],{},"Rapports d'audit remis",[76,192,193,196,199,202],{},[97,194,195],{},"6 — Lancement",[97,197,198],{},"Recette des 3 parcours, publication stores, formation",[97,200,201],{},"M7–M8",[97,203,204],{},[62,205,206],{},"Mise en production",[59,208,209,210,214],{},"Trois ingénieurs à plein temps, un périmètre déjà construit ailleurs (voir ",[211,212,213],"a",{"href":50},"nos références",") et une chaîne de tests automatisés qui vérifie chaque exigence à chaque changement de code.",[216,217,219],"h2",{"id":218},"au-delà-de-la-v1","Au-delà de la V1",[59,221,222],{},"La V1 est notre unique périmètre contractuel. Chaque frontière de module et chaque ligne du registre de paiement est tracée en fonction des versions suivantes : la V2 se pose sur la V1, elle ne la remplace pas.",[224,225],"erk-roadmap-horizon",{},{"title":227,"searchDepth":228,"depth":228,"links":229},"",2,[230],{"id":218,"depth":228,"text":219},"Sept phases, trois pistes parallèles, mise en production à M+8.","md",{"icon":234},"lucide:calendar-range",true,{"title":33,"description":231},"M8JVv2POZsTp6jS3nHVyyZ4qCD6LJNqTIknpH0h4GE0",[239,241],{"title":29,"path":30,"stem":31,"description":240,"children":-1},"La couverture complète du cahier des charges, famille par famille.",{"title":39,"path":40,"stem":41,"description":242,"children":-1},"Sprints de deux semaines, démos systématiques, recette continue.",1784726248077]