[{"data":1,"prerenderedAt":243},["ShallowReactive",2],{"navigation_docs_en":3,"-en-roadmap":52,"-en-roadmap-surround":238},[4,14,32,42],{"title":5,"path":6,"stem":7,"children":8},"The essentials","/en/proposition","en/1.proposition/1.index",[9,10],{"title":5,"path":6,"stem":7},{"title":11,"path":12,"stem":13},"Your need, understood","/en/proposition/comprehension","en/1.proposition/2.comprehension",{"title":15,"path":16,"stem":17,"children":18},"Overview","/en/architecture","en/2.architecture/1.index",[19,20,24,28],{"title":15,"path":16,"stem":17},{"title":21,"path":22,"stem":23},"Technical choices","/en/architecture/stack","en/2.architecture/2.stack",{"title":25,"path":26,"stem":27},"Security & compliance","/en/architecture/securite","en/2.architecture/3.securite",{"title":29,"path":30,"stem":31},"The 19 modules","/en/architecture/modules","en/2.architecture/4.modules",{"title":33,"path":34,"stem":35,"children":36},"The 8-month plan","/en/roadmap","en/3.roadmap/1.index",[37,38],{"title":33,"path":34,"stem":35},{"title":39,"path":40,"stem":41},"The method","/en/roadmap/methodologie","en/3.roadmap/2.methodologie",{"title":43,"path":44,"stem":45,"children":46},"Vortex-Soft","/en/equipe","en/4.equipe/1.index",[47,48],{"title":43,"path":44,"stem":45},{"title":49,"path":50,"stem":51},"References — eCampus","/en/equipe/references","en/4.equipe/2.references",{"id":53,"title":33,"badge":54,"body":55,"category":54,"description":231,"extension":232,"links":54,"meta":233,"navigation":235,"path":34,"seo":236,"stem":35,"tags":54,"__hash__":237},"docs_en/en/3.roadmap/1.index.md",null,{"type":56,"value":57,"toc":226},"minimark",[58,66,69,207,215,220,223],[59,60,61,65],"p",{},[62,63,64],"strong",{},"Go-live at M+8."," Design stays one sprint ahead of development; three tracks advance in parallel, one per engineer.",[67,68],"erk-gantt",{},[70,71,72,91],"table",{},[73,74,75],"thead",{},[76,77,78,82,85,88],"tr",{},[79,80,81],"th",{},"Phase",[79,83,84],{},"Content",[79,86,87],{},"Period",[79,89,90],{},"Milestone",[92,93,94,109,126,143,160,177,191],"tbody",{},[76,95,96,100,103,106],{},[97,98,99],"td",{},"0 — Framing",[97,101,102],{},"Workshops, mockups, design system, infrastructure",[97,104,105],{},"M1",[97,107,108],{},"Approved mockups",[76,110,111,114,117,120],{},[97,112,113],{},"1 — Foundation",[97,115,116],{},"2FA auth, 7 roles, projects, dashboard",[97,118,119],{},"M2–M3",[97,121,122,125],{},[62,123,124],{},"Demo 1",": you log into ERK+",[76,127,128,131,134,137],{},[97,129,130],{},"2 — Steering & transactions",[97,132,133],{},"Timeline, budget, finance, quotes, payments",[97,135,136],{},"M3–M4",[97,138,139,142],{},[62,140,141],{},"Demo 2",": end-to-end financial journey",[76,144,145,148,151,154],{},[97,146,147],{},"3 — Site & media",[97,149,150],{},"Site journal, materials, photos, videos, live camera",[97,152,153],{},"M3–M5",[97,155,156,159],{},[62,157,158],{},"Demo 3",": your site, live",[76,161,162,165,168,171],{},[97,163,164],{},"4 — Documents & communication",[97,166,167],{},"Vault, e-signature, messaging, notifications",[97,169,170],{},"M5–M6",[97,172,173,176],{},[62,174,175],{},"Demo 4",": a contract signed in the vault",[76,178,179,182,185,188],{},[97,180,181],{},"5 — Hardening",[97,183,184],{},"Reports, delivery, warranty; load & penetration tests",[97,186,187],{},"M6–M7",[97,189,190],{},"Audit reports delivered",[76,192,193,196,199,202],{},[97,194,195],{},"6 — Launch",[97,197,198],{},"Full acceptance, store publication, training",[97,200,201],{},"M7–M8",[97,203,204],{},[62,205,206],{},"Production",[59,208,209,210,214],{},"Three full-time engineers, a scope already built elsewhere (see ",[211,212,213],"a",{"href":50},"our references","), and an automated test suite that verifies every requirement on every code change.",[216,217,219],"h2",{"id":218},"beyond-v1","Beyond V1",[59,221,222],{},"V1 is our only contractual scope. Every module boundary and every line of the payment ledger is drawn with the next versions in mind: V2 rests on V1, it does not replace it.",[224,225],"erk-roadmap-horizon",{},{"title":227,"searchDepth":228,"depth":228,"links":229},"",2,[230],{"id":218,"depth":228,"text":219},"Seven phases, three parallel tracks, production at M+8.","md",{"icon":234},"lucide:calendar-range",true,{"title":33,"description":231},"QidRUi1DDFtR-lZgOZUW4SzwhxP9iUGz2wm50TVNDDs",[239,241],{"title":29,"path":30,"stem":31,"description":240,"children":-1},"Full coverage of the specification, family by family.",{"title":39,"path":40,"stem":41,"description":242,"children":-1},"Two-week sprints, systematic demos, continuous acceptance.",1784726248188]